(A) A C&D diversion report shall not be required for the following:
(1) Work for which a building permit is not required under Chapter 15.04 of this code.
(2) Residential alterations of less than $2,000 in value.
(3) Non-residential alterations of less than $5,000 in value.
(4) Work for which only a plumbing permit, only an electrical or only a mechanical permit is required.
(5) Seismic tie-down projects.
(6) The installation or replacement of shelves.
(7) Installation of pre-fabricated patio enclosures and covers where no foundation or other structural building modifications are required.
(8) Installation of swimming pools and spas, provided that the exemption shall apply only to (a) the area to be excavated for the installation of the pool or spa and (b) the area for the pad for the pool/spa equipment that does not exceed 16 square feet; and shall not apply to any related construction or alterations necessary for any other equipment or accessories, nor to any other portion of the project.
(9) Installation of pre-fabricated accessories such as signs or antennas where no structural building modifications are required.
(B) It is unlawful to split or separate a project into small work projects for the purpose of evading the requirements of this chapter.
(Ord. 783, passed 9-3-2014)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');